| HOME > PROJECTS > GAS STORAGE FACILITIES |
![]() |
| Project: Description: |
Alberta Hub Storage Edson, Alberta Project management, engineering design, drafting and procurement for gas storage project. Inbound rate of approximately 350 MMSCFD and outbound rate of 500 MMSCFD. Facility built as a 1 BCF/day unit. Facility installed with refrigeration system on outbound cycle. |
![]() |
| Client: Project: Description: |
UNOCAL |
|
| Client: Project: Description: |
AEC “C” Oil and Gas AEC Suffield Storage Facility - Suffield, Alberta Project management, engineering design, drafting and procurement at AEC Suffield facility. Inbound rate of approximately 250 MMSCFD and outbound rate of 350 MMSCFD. Facility work included pipeline and wellhead facilities inside the Suffield military range. |
|
| Client: Project: Description: |
AEC “C” Oil and Gas AEC Suffield Storage Facility - Suffield, Alberta FEED engineering for expansion of AECO HUB at Suffield for plant layouts and compression selection to increase capacity to 1.5 BCF/day injection rate and outbound capacity to 2.5 BCF/day. |
|
| Client: Project: Description: |
Canadian Western Natural Gas Bow Island Storage Facility - Bow Island, Alberta Upgrade and modernization of storage facilities to provide automated control for Calgary for compressor start/stop, flow control and switching from injection to production. |
|
| Client: Project: Description: |
Canadian Western Natural Gas CWNG Storage Facility Carbon, Alberta Engineering for costs and equipment selection for refrigeration unit to correct hydrocarbon dewpoint on production cycle. |
|
| Client: Project: Description: |
Husky Oil Ltd. Storage Facility - Hussar, Alberta Management, engineering design, drafting and procurement for gas storage project. Inbound rate of approximately 150 MMSCFD and maximum outbound rate to 200 MMSCFD. |
|
| Client: Project: Description: |
Northwestern Utilities Ltd. Fort Saskatchewan Storage Facility Fort Saskatchewan, Alberta Project management, engineering design, drafting and procurement for salt cavern gas storage project. Inbound rate of approximately 150 MMSCFD and outbound rate of 500 MMSCFD. Storage capacity of 3.0 BCF at maximum pressure of 3,600 psig. |